Smaller text size Reset text size Larger text size
skip navigation
Air Rail Highway Bike/Ped Public Transit

Final Environmental Impact Statement (FEIS)

The project documents below are available for viewing/downloading. In some cases the files linked here are very large and can exceed 4.0MB in size. A high-speed internet connection is recommended for downloading these large files. If not currently installed on your computer, you will need to download the Adobe Acrobat Reader free browser plug-in to view the PDFs.

FEIS Documents: Complete volumes (larger files)
Executive Summary [0.4MB]
Executive Summary and Socio-Economic Excerpts [1.9MB]
Volume 1 Complete [3.8MB]
Volume 2 Complete [22.5MB]
Volume 3 Complete [43.4MB]
Volume 4 Complete [11.0MB]


FEIS Documents: Multiple file volumes (smaller files)
Executive Summaries
Executive Summary [0.4MB]
Executive Summary and Socio-Economic Excerpts [1.9MB]

Volume 1
Volume 1 Complete [3.8MB]

Volume 2
Front Cover – Figure 2.4-9 [4.5MB]
Figure 2.4-10 – Figure 2.4-32 [4.0MB]
Figure 2.4-33 – Figure 3.17-3 [4.3MB]
Figure 3.18-1 – Figure 4.14-4 [4.3MB]
Figure 4.17-1 – Figure 5.4-5 [5.5MB]

Volume 3
Volume 3 - A [4.2MB]
Volume 3 - B1-1 [3.5MB]
Volume 3 - B1-2 [4.2MB]
Volume 3 - B1-3 [4.4MB]
Volume 3 - B1-4 [4.0MB]
Volume 3 - B2-1 [3.3MB]
Volume 3 - B2-2 [3.4MB]
Volume 3 - B2-3 [3.3MB]
Volume 3 - B2-4 [3.5MB]
Volume 3 - C – H [3.0MB]
Volume 3 - I [3.6MB]
Volume 3 - J – O [2.9MB]

Volume 4
Volume 4 - Federal [1.3MB]
Volume 4 - State [1.5MB]
Volume 4 - Local [2.3MB]
Volume 4 - Personal 1 [2.5MB]
Volume 4 - Personal 2 [3.6MB]

 






New Hampshire Department of Transportation
PO Box 483 | 7 Hazen Drive | Concord, NH | 03302-0483
Tel: 603.271-3734 | Fax: 603.271.3914
copyright 2009. State of New Hampshire